Roof and wall U-values in Poland: which requirements apply to a project in 2026?
If you are insulating a house in Poland, ask the designer for the required U-value of the complete wall or roof before ordering materials. As of 1 November 2026, a transitional period allows certain projects to use the earlier Polish building regulations. The type of work, the approval procedure and the design temperature of the room all matter. Look for the assembly’s U-value in the design and the material’s thermal conductivity, or lambda, on its data sheet. Choosing a board with a low lambda does not by itself establish that the finished wall or roof meets the requirements.









