Checks before using second-grade 100 mm wall panels

A good-looking surface does not explain why the panel was placed in second grade. The defect may concern colour, dimensions, edges or the bond between layers. With a 100 mm wall panel, the specific batch and the planned use must be assessed. Only then can you calculate whether the lower price will actually translate into a saving. Ask for a precise description of the reason for the downgrade. The term “second grade” does not indicate one common defect shared by all offers. It may cover various deviations, so information about the specific batch is needed. A photo of the whole pack does not replace inspection of the edges and surface.

By |2026-11-14T17:29:21+01:002022-11-02|Blog|Comments Off on Checks before using second-grade 100 mm wall panels

Roof coverings to compare before you start building

The right roof covering depends above all on the roof pitch, the structure and how the building is used. Metal tile sheeting suits many houses, T18 and T35 trapezoidal profiles work well on simple slopes, and a roof sandwich panel can combine the outer skin with insulation. Tiles, shingles and flat-roof waterproofing form separate systems. Compare the complete roof, including the substrate, details and labour. Start from the design or measure the existing roof: pitches, slope lengths, valleys, corners, service penetrations and the permissible structural load will narrow the choice far better than a colour catalogue.

By |2026-11-14T21:01:36+01:002022-11-02|Blog|Comments Off on Roof coverings to compare before you start building

What to consider when planning a metal patio roof

First arrange the table, chairs and walkways so you can clearly define which part of the terrace to shelter. The roof should protect the area you actually use, including against rain blown in from the side. Sometimes covering only part is enough, which keeps a sunny spot and avoids over-shading the room behind a large window. Sheet metal gives a light, durable covering, but the whole system matters: supports, slope, drainage and the wall junction. Bear in mind shade, the sound of rain and condensation.

By |2026-11-15T00:56:36+01:002022-11-01|Blog|Comments Off on What to consider when planning a metal patio roof

Sandwich panels from order to first inspection: what should you check?

A sandwich panel is a ready-made cladding element, but it does not replace the entire building design. Its core, facings and joints must suit the task. Delivery, installation and subsequent use are equally important. This guide organises the decisions from the first enquiry through to the inspection of the finished wall or roof. The core is bonded to the facings into a single element. In typical external cladding panels, the outer layers are steel. The core may be made of, among other things, PIR, PUR, mineral wool or polystyrene. The properties are determined by the entire panel construction, not just the name of the material inside.

By |2026-11-14T14:21:26+01:002022-10-24|Blog|Comments Off on Sandwich panels from order to first inspection: what should you check?

PIR on site: receiving, storing and tracking board quantities

The organisation of the material affects the quality and the pace of the thermal insulation. PIR boards should arrive on the prepared site in the agreed variant. Receiving the packs, protection from the weather and a cutting plan help to limit losses. It is also worth keeping information about the batches from the outset. PIR boards can look similar yet have different facings, strength and intended use. Before purchase, a current technical data sheet, a declaration of performance and installation instructions are needed. The label should be checked before laying out the boards in different zones. Establishing later where an incorrect delivery was used can be considerably more difficult. On accepting the delivery, the markings should be compared with the material list for the given zone.

By |2026-11-16T04:07:12+01:002022-10-22|Blog|Comments Off on PIR on site: receiving, storing and tracking board quantities

Tile-effect metal roofing or clay tiles: which is easier to incorporate into a roof renovation?

Choosing a covering during a renovation starts with assessing the roof structure. Only then is it worth comparing appearance, price and speed of work. Tile-effect metal roofing is lightweight, but its cost does not end with the sheets. Clay tiles require accounting for greater weight. Both solutions need a correct layer build-up and carefully executed details. This cannot be determined from the roof's appearance from the street. An assessment of cross-sections, connections, support and condition of the timber is needed. Defects, dampness or previous alterations change the situation. It is not enough to state that the old covering was heavy, so any new one will be suitable.

By |2026-11-14T11:09:38+01:002022-10-17|Blog|Comments Off on Tile-effect metal roofing or clay tiles: which is easier to incorporate into a roof renovation?

Choosing between steel and PVC gutters for your home

Choosing between steel and PVC guttering starts with establishing how much water each run must carry, not with the material itself. Check the roof area drained by that run, the outlet positions, and the local rainfall conditions and roof geometry. Compare the capacity tables for the specific system, because gutter diameter alone does not tell the whole story — shape and outlet connection also matter. Consider the material only within a layout with adequate capacity; an attractive colour will not compensate for an undersized outlet.

By |2026-11-14T21:01:21+01:002022-10-17|Blog|Comments Off on Choosing between steel and PVC gutters for your home

Tightening corrugated roof fixings without damaging the sheets

A tight fastening is not achieved by driving the screw in with maximum force. Corrugated fibre cement sheets require system-compliant pressure without crushing the material or restricting its movement. Asbestos-free fibre cement can crack at the fastener if the connection is made too rigidly. The seal, the hole and the support should work together. The screw holds the sheet on the support, and the washer with seal limits water access to the hole. The connection is not there to pull a warped sheet onto an uneven structure. If incorrect positioning is visible before tightening, its cause must first be established. Stress forced by the fastening may remain invisible on the day of installation. Later temperature changes or loads may reveal the problem.

By |2026-11-15T20:23:24+01:002022-10-12|Blog|Comments Off on Tightening corrugated roof fixings without damaging the sheets

EFIGREEN ALU+ and ALU+ XL: transport and installation preparation

Before starting the insulation of a roof slope broken up by numerous service penetrations, the unloading point and the sequence of work must be established. For EFIGREEN ALU+, the first point will be the narrow field between two service bases. The team should have a drawing that sets out cuts for the chosen ALU+ or XL board dimensions, not just a list of the purchased materials. At a cramped cutting station, a complete cutting plan and stable stacking of offcuts are important. Small fragments do not automatically go into every available gap — their support and suitability at the intended location must be checked. Separating material for installation from waste keeps the workstation organised.

By |2026-11-16T04:08:02+01:002022-10-06|Blog|Comments Off on EFIGREEN ALU+ and ALU+ XL: transport and installation preparation

How do several site crews coordinate sandwich panel installation?

Most corrections arise where one crew's scope ends and another's work begins. This applies to supports, openings, flashings and installations. It is therefore worth breaking the panel installation down into stages with clear handover. Each team should know what it finds on site and what it must prepare for the next contractor. Before you order the panels, gather the current structural and cladding drawings. Check whether they use the same axes and levels. A change in gate width may require shifting a support and adjusting the panel cutting plan. A correction to the door and window schedule alone will not automatically change the material order.

By |2026-11-14T14:20:56+01:002022-10-04|Blog|Comments Off on How do several site crews coordinate sandwich panel installation?