PIR insulation
BauderPIR M/MF on site: protecting the mineral facing
At a glance
BauderPIR M/MF has mineral fleece facings on both sides, so the quality of the finished roof depends not only on how the boards are laid but also on the condition of this layer before it is covered with the waterproofing. The fleece must be protected from soiling and damage during walking and when tools are set down. The team installing the covering should receive the surface in the agreed condition. The documentation for the specific M or MF thickness and the method of connection to the covering should be available on site, not only in the order. Acceptance is not limited to the number of boards laid: it also covers corners, joints and the locations of future penetrations.

Preparing the work section
Before cutting, the thickness of the delivered insulation and the condition of the substrate must be checked, because a discrepancy revealed after cutting increases material losses. The findings on lambda and on the connection of the insulation to the covering are passed on by the specialist who approves their conformity.
The actual product and the scope of its data
The BauderPIR M/MF board combines a PIR core with mineral fleece on both sides, and the format of the family is 1200 × 600 mm. The M and MF variants differ in the shape of their edges. The Polish data sheet for M states λD 0.026 W/(m·K) for 80 mm up to below 120 mm, which is not a constant lambda of 0.022. The documentation indicates at least 120 kPa in the compression test and reaction to fire class E. Bauder PIR boards should be assessed for the roof range with a PIR board with a mineral facing; BauderPIR M/MF polyurethane insulation allows the correct lambda and a compatible connection to the covering to be established. The properties of the complete board cover both the PIR core and its facings.
A calculation to help with planning
A BauderPIR M/MF layer with an area of 34 m² and a thickness of 100 mm corresponds geometrically to 3.40 m³ built into an ideally fully filled field. The transport volume may differ because of packs and allowance, and this calculation does not yield the permissible load on the structure at the storage location. The boards must be laid on a level substrate and the fleece protected from damage, while keeping access to the area beneath the waterproofing layer.
Before cutting the BauderPIR M/MF batch, it must be established which thickness and variant (M or MF) the documentation for the ordered variant covers, because the lambda depends on the thickness of the M variant. This helps to identify the variant but does not replace measurement of the executed area. The mineral facing must correspond to the adopted covering system, and the site condition determines conformity. After full packs have been split, the boards should retain legible marking so that the delivery and the cutting station work from the same data.
Decision before replicating the layout
Before the first section, it is worth establishing whether the project accounts for preserving the designed facing and selecting the required thickness. The second option under consideration is changing the entire confirmed assembly after re-comparison, if this follows from an agreed change. The first section with BauderPIR M/MF should also be checked in the area of the fleece beneath the waterproofing layer, and not only on an easy field without obstacles. It would be a mistake to calculate the board with the mineral facing using the lambda of the aluminium variant. Compliance of the insulation with the covering is assessed by the approving specialist before the team moves on to a larger scope. After an agreed change, the schedule of parameters covering thickness, facing and edge must be updated so that delivery and the cutting station work to the same data.
What to check during fitting
During the laying of BauderPIR M/MF, the geometry of the joint must match the variant: a plain edge profile in M or a profiled edges in MF. The matt mineral fleece must be handled so as not to damage it, and the layers must be laid on an even substrate with undamaged fleece. At acceptance, the description of the fleece on both surfaces and of the correct edge profile, compiled on site, is helpful. A mismatch must be corrected before the waterproofing covering compatible with the mineral facing is applied; the continuity of the fleece when cutting or changing the direction of work requires a separate check.
Delivery matched to the team’s capacity
The quantity of BauderPIR M/MF at the station should correspond to the scope that can be prepared and protected. The material layout should be based on the schedule of parameters covering thickness, facing and edge. Access to the area of the fleece beneath the waterproofing layer must be left so that acceptance does not require moving the entire delivery. The plan for the working break must account for the waterproofing covering compatible with the mineral facing and for protecting the open boundary; after a change of front, the condition of compatibility of the mineral facing with the adopted system must be reconsidered. The boards remain identifiable by variant, not by where the pack was placed.
Handover of the completed layer
Handing over works with BauderPIR M/MF insulation requires establishing which version was laid: M or MF. Identification is based on the description of the fleece on both surfaces and on the correct edge profile of the board, and not merely on the statement that insulation is present. In the handover documentation, record the thickness and version, the manner in which the fleece was laid beneath the waterproofing, and the connection with the covering, together with information on who approved this section. The next team receives a set relating to the specific thickness and version, with the locations requiring care marked. Only a scope described in this way allows the insulation to be regarded as a checked part of the works.
7 branches. Materials closer to your project.
- SEROCK — Dzierżenin 34 E
- BŁONIE — ul. Sochaczewska 138A
- RADOM — ul. Grobickiego 8
- ŁÓDŹ — Natolin 8
- OLSZTYN — Barczewo, ul. Prosta 9
- WROCŁAW — ul. Jerzmanowska 10C
- GORZÓW WLKP. — ul. Zielona 33/34