Eurothane Silver is a PIR board with multi-layer gas-tight foil on both sides and a printed grid, intended in the current data sheet for flat roofs in a classic layout. Practical laying begins with establishing the cutting plan and the order in which pallets are opened, because the format and the edge determine the number of joints and the pace of work. On the roof, the support, the fixing and the protection of the insulation against water are checked in parallel. Before the material is divided between the work stations, the board must be assigned to a specific system: mechanical fixing, bonding or ballast.

Preparing the delivery for work
The wide range of applications of the board does not exempt you from choosing one agreed arrangement before ordering the insulation and the waterproofing layer. Before distributing the PIR boards to the work stations, check the substrate, the waterproofing variant and the documentation of how the roof layers are to be joined with the person in charge of the works.
How to lay successive sections
Eurothane Silver is available in the formats 600 × 1200 and 2400 × 1200 mm. The 20 mm variant is specified only in the smaller format.
On the first section to be installed, check the choice of the 600 × 1200 or 2400 × 1200 mm format and the order for the specified edge. The Silver format and edge must be matched to the thickness of the delivery and the number of obstacles on the roof slope when accepting the first section, before the working method is repeated. The error should not be repeated in subsequent rows, since the 20 mm variant appears in the data sheet only in the smaller format. After assessing the first section, the insulation can be set out according to the variant actually available for the thickness adopted. Before the polyurethane insulation is covered, record the dimension of the supplied board, the square edge or the ordered rebated edge, and the effective covering area in the works documentation.
Label Eurothane Silver deliveries simultaneously by thickness, format and type of edge, so that the material can be divided into areas without relying on the appearance of the foil. Compare the 20 mm variant with the documentation for the larger boards and clarify any discrepancy before cutting. Unpacked items retain a clear link to the correct order item.
Dry storage and closing the layers
A roof assembly with Eurothane Silver requires the vapour control layer and waterproofing to be matched to the building’s conditions. The gas-tight surface of the board does not close the gaps across the whole roof.
At the end of the working day, check the junction between the roof field and the parapet, and the places where services pass through the roof. At the parapet and the penetrations, the water shield and the vapour control layer must be laid so that they can be connected before the next team takes over the works. The gas-tight foil on Eurothane Silver does not by itself close all the gaps between components, so the prepared protection must allow the layers to be sealed together where different materials meet, and not merely the boards to be taped. Rigid polyurethane boards still require protection; before work resumes, assess the arrangement of the vapour control layer, the upstand of the covering and the sealing of the specific penetration.
Thickness conformity with the design
Eurothane Silver has a declared lambda of 0.022 W/(m·K) for the range of 20–200 mm. The choice of thickness should follow from the calculation of the building element.
Before making the first cut, check in the documentation the data for the Eurothane Silver layer selected according to the lambda of 0.022 W/(m·K) and the required roof height. The influence of the fasteners and the terminations must be checked in the calculation of the whole roof with Eurothane Silver before marking out and cutting the components intended for installation. Do not choose the variant on appearance alone, because the R-value of an even section of board does not include a correction for each fastener passing through the insulation. The check before installation should compare the material parameter with the geometry and the fixing method of the actual roof. On acceptance of the delivery described as polyurethane boards, record the thickness of the main field, the number and type of fasteners and the detail of the thermal insulation perimeter.
Fixing and loads during the works
The Eurothane Silver data sheet of September 2026 gives CS120 for 20 mm and CS150 from 30 mm. The reaction to fire of the board itself from 30 mm is class F, and for 20 mm it remains undetermined.
Before allowing further crews onto the finished layer, check the difference between CS120 for 20 mm and CS150 from 30 mm as stated in the current data sheet. After changing the Silver thickness, the mechanical data and the scope of the fire declaration must be read again before the adopted solution is approved for the further stages of work. During the works, bear in mind that B-s2,d0 refers to the specified application on sheet metal, not to any free-standing board. Before closing a section, keep the distinction between the properties of Eurothane Silver and the assessment of the complete roof system. In the section record, confirm the correct row of the parameter table and the classification conditions corresponding to the designed construction, and report any discrepancies before continuing the task.
Acceptance before covering
In the Eurothane Silver offer, the thickness, the edge and the covering system must be stated. Visually similar PIR boards may differ in their scope of application or mechanical characteristics.
When accepting works described as “polyurethane insulation”, check offers covering similarly looking silver boards but different roof systems. The equivalence of a Silver substitute must be assessed through the facing and the application in addition to the thermal parameters when settling the material and handing the section over to the next trade. A joint agreement on the scope is needed because a similar printed grid does not prove identical suitability for the adopted covering. Before handing the front over to the next trade, it is worth checking technical equivalence before comparing prices per square metre of insulation. In the as-built documentation, keep the full name Eurothane Silver, the thickness, the side profile and the scope of works at the roof closure, so that acceptance is not based solely on the number of packages used.
7 branches. Materials closer to your project.
- SEROCK — Dzierżenin 34 E
- BŁONIE — ul. Sochaczewska 138A
- RADOM — ul. Grobickiego 8
- ŁÓDŹ — Natolin 8
- OLSZTYN — Barczewo, ul. Prosta 9
- WROCŁAW — ul. Jerzmanowska 10C
- GORZÓW WLKP. — ul. Zielona 33/34