Kingspan board delivery: how to check compliance with the documentation

At a glance

Kingspan Therma TR26 and Therma TR27 have a PIR core, whereas the Kooltherm family is based on phenolic foam, so the brand name alone does not indicate the type of insulation. At the check-in before the material is split between the workstations, the team establishes the core, the facing and the place of application, because a project description limited to the manufacturer’s name does not allow the delivery to be assigned to the correct section of the building envelope. Clear labelling of the packaging makes it easier to spot discrepancies before installation, before a similar facing is taken to be the same product.

Detail of the core and thin metallised facing of an insulation board in an Izoprofil.net illustration.

Preparation of the workstation

The manufacturer’s name covers various materials, including PIR Therma and phenolic Kooltherm, so delivering the correct packs is not enough to identify the material suited to the designed function and method of installation. Before distributing the PIR boards to the workstations, the team checks the full product name, the core type, the declaration of properties and the place of use in the building together with the person managing the works.

Accuracy of the joints

TR26 has a facing containing aluminium, whereas TR27 has a glass fibre facing. These surfaces differ in construction and must correspond to the way the layers of the designed roof are joined. On the first section to be installed, check the substitution of the aluminium facing of TR26 with the glass fibre facing of TR27 in the roof description.

When substituting the board, the team checks that the new facing is compatible with the fixing and the covering on the first section before repeating the working method, so as not to repeat the error in subsequent rows. A common PIR core is not sufficient to substitute the product without assessing the joints between the layers. Before the polyurethane insulation is covered, the type of surface, the permitted method of joining and the side geometry of both compared boards are recorded in the works documentation.

On site, the Kingspan product designations must be transferred from the delivery documents to the schedule of places of use. A similar surface is not sufficient for identification, especially when several variants have been ordered at the same time. Clarify the change of designation before installation. Only conformity of the specific batch with the specification allows acceptance of the properties and the method of execution of the given layer to begin.

Protection after completion of the layer

The Therma insulation board is not the same product as a complete sandwich panel with structural facings, therefore the load-bearing function, the fixing and the method of executing the sealing layers are assigned to the actual solution. At the end of the day’s stage, the team checks the change of the insulation product in the cross-section, which has separate layers for vapour control and protection against water.

A material change must preserve the continuity of the designed protection against water and vapour flow before the installed layer is handed over to the team carrying out further works. Do not leave this matter without agreement, because a similar board colour does not confirm the same connection conditions with the membrane or flashing. The prepared protection should maintain the correct protective arrangement regardless of the chosen rigid insulation family. Polyurethane foam in rigid boards still requires protection; before resuming work, assess the description of all layers, the perimeter details and the scope of documentation for the proposed replacement.

Identifying the board variant

Therma TR26 has a lambda of 0.022 W/(m·K), while the values for Therma TR27 depend on thickness. Before the first cut, the team compares in the documentation the parameters of TR26 and TR27 boards with different lambdas at the same thickness in order to identify the variant with the poorer thermal performance. Calculating the equivalent thermal effect requires reading the parameter of the precisely selected variant.

Before marking and cutting the elements intended for installation, the team compares the Kingspan variants in question at the same required thermal resistance. Do not select a variant by appearance, because attributing a lower lambda to the whole brand distorts the parameters of the other product families. The check before installation is to allow the thermal equivalence to be assessed at the level of precisely designated offer variants. On acceptance of a delivery described as polyurethane boards, record the lambda for the selected thickness, the correct RD and the consequences of changing the build-up height.

Board parameters and delivery organisation

In the acceptance documentation, distinguish three matters: the material’s reaction to fire, the fire resistance of the complete building element and the board’s mechanical properties. In particular, a compression test at 10% deformation does not in itself establish the permissible design load. Organising the results in this way before subsequent teams arrive prevents a single product property from being substituted for an assessment of the complete solution.

Read every Kingspan parameter together with the name of the test, the scope of application and the actual function of the product. A favourable result for one property does not prove that all the building’s requirements are met. Before closing a section, confirm in the record the full declaration for the correct variant and the system documentation concerning load-bearing capacity and fire protection. Discrepancies must be clarified before further works proceed.

Settlement and inspection of the completed stage

The offer for Kingspan insulation should state the full product designation and its thickness. When accepting works described as “polyurethane insulation”, the team checks any proposal to replace one Kingspan board with another of a similar name or the same surface colour. A substitution proposal is assessed by its effects on the entire system, not merely by the shared PIR designation.

Before handing the area over to the next trade, compare the offers for different Kingspan boards together with the changes in the other layers that the material settlement entails. Agree the scope jointly, because a lower price may result from a different application rather than from a saving with an identical effect. Agree the equivalence criteria before approving the purchase and changing the construction documentation. In the as-built documentation, retain the required thermal resistance, the geometry, the method of fixing and the cost of adapting the adjacent layers, so that acceptance is not based solely on the number of packs used.

7 branches. Materials closer to your project.

Izoprofil.net map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E
  • BŁONIE — ul. Sochaczewska 138A
  • RADOM — ul. Grobickiego 8
  • ŁÓDŹ — Natolin 8
  • OLSZTYN — Barczewo, ul. Prosta 9
  • WROCŁAW — ul. Jerzmanowska 10C
  • GORZÓW WLKP. — ul. Zielona 33/34

Check prices and availability: +48 500 409 109

Free quote

Materials for your project