IKO enertherm ALU TAP: checking deliveries and fall directions

At a glance

Before work begins with aluminium tapered boards of different slopes, the unloading point and the sequence of execution must be established. In IKO enertherm ALU TAP, the first working point is the junction of fields with a different drainage direction. The team should have a drainage-field plan showing the slopes and heights, not just a list of the materials purchased. Once the packs have been split, similar wedges with different slopes need a clearly identifiable storage location, and at the end of the shift it is worth marking the element where the field was interrupted, so that resuming work does not start with guessing the sequence from the appearance of the surface.

Three upright boards of different thicknesses with silvery surfaces

Preparation of the work section

Before cutting, the height difference between the ends of the taper must be measured, along with the length in the direction of fall, because a discrepancy discovered after cutting increases losses. The arrangement of the correct tapers is to lead water in accordance with the plan. The decisions for the detail are conveyed by the designer of the drainage and tapered insulation layout.

The actual product and the scope of its data

IKO enertherm ALU TAP has a PIR core, aluminium laminate on both sides and a format of 1200 × 1200 mm. The manufacturer specifies falls of 0.83%, 1.25% and 1.67%. Lambda is 0.022 W/(m·K), compressive stress at least 175 kPa, and reaction to fire E. The boards have square edges. Selecting the elements requires a drainage plan and a thermal calculation that accounts for the variable thickness. The properties of the complete board also include the facings, not only the core.

A calculation aid for planning

To explain the geometry, let us take a 1.20 m section with a constant slope of 1.25%. The height difference between its ends will be approximately 15.0 mm. In the IKO enertherm ALU TAP family, the stated fall value is based on the documentation, but the example does not define a complete field or a starting height. The level at the outlet also depends on the substrate and the underlying layers. A detail covering the junction of fields with a different drainage direction must also be developed. The result must not be treated as the thermal resistance of the roof. To check the execution, a drainage field plan with marked slopes and heights is needed, showing the actual course of all sections.

The value from the example for IKO enertherm ALU TAP refers to a specific section of the works, so before laying, the element designation must be linked to its position in the design. The order of the elements between the outlet and the edge follows from the drainage field plan with marked slopes and heights. The choice among the falls of 0.83%, 1.25% and 1.67% helps to identify the variant, but does not replace measurement of the completed surface. A roof with aluminium tapered boards of different slopes requires clear labelling of the material also after full packs have been split.

Decision before replicating the layout

Before the first section, it must be established whether the design provides for splitting the delivery by fields and wedge types, and whether a change in the layout after re-checking the position of the outlets results from an agreed change. Checking the first section with IKO enertherm ALU TAP should cover the junction of fields with a different drainage direction, not only an easy field without obstacles. A particular mistake would be swapping elements of similar thickness and different slope. The result is assessed by the designer of the drainage and tapered insulation layout before the team moves on to a larger scope. After the change, the list of ALU TAP wedges must be updated with their slopes separated, so that the delivery and the cutting station work from the same data.

What to check during fitting

During the laying of IKO enertherm ALU TAP, a straight junction of adjacent wedges in accordance with the drawing must be maintained. The working surface is the aluminium facing of the square tapered board, so the method of handling should not damage it. The layer build-up must provide a substrate that maintains the designed levels of the tapered fields. At acceptance, a list of wedge labels and the results of the slope-direction measurement, collected at the place where the works are carried out, will be useful. The next stage is the covering laid on the accepted tapered field, so any fitting error should be removed beforehand. The junction of fields with a different drainage direction requires separate checking, as continuity is easily lost there when cutting or changing the direction of work.

Delivery matched to the team’s capacity

The quantity of IKO enertherm ALU TAP at the station should correspond to the scope that can be prepared and protected. Material planning is organised by the list of ALU TAP wedges with their slopes separated. Access to the junction of fields with a different drainage direction must be left so that acceptance does not require moving the entire delivery. The work-break plan must take into account the covering laid on the accepted tapered field and the method of protecting the open boundary. If the work front changes, the order of elements between the outlet and the edge must be reconsidered. The polyurethane boards should remain identifiable by type, and not merely by the place where a pack happened to be put down.

Handover of the completed layer

Handing over a roof with aluminium tapered boards of different slopes requires comparing the completed works with the drawing and the agreed corrections. For IKO enertherm ALU TAP, the basis is the wedge labels and the slope-direction measurement, which confirms whether the wedges will direct water in accordance with the plan. The next team should receive the drainage-field plan with slopes, heights and places requiring caution. It is also worth recording how the junction of fields with a different drainage direction was resolved and who approved it. The polyurethane insulation is then handed over as a checked portion of the works, and not as an occupied area of the construction site.

7 branches. Materials closer to your project.

Izoprofil.net map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E
  • BŁONIE — ul. Sochaczewska 138A
  • RADOM — ul. Grobickiego 8
  • ŁÓDŹ — Natolin 8
  • OLSZTYN — Barczewo, ul. Prosta 9
  • WROCŁAW — ul. Jerzmanowska 10C
  • GORZÓW WLKP. — ul. Zielona 33/34

Check prices and availability: +48 500 409 109

Free quote

Materials for your project