PIR insulation

A cold patch beside a duct in a PIR roof: what to check before repairs

At a glance

A ceiling stain beside a ventilation duct does not reveal whether the roof leaks, moisture is condensing or insulation is missing around the penetration. Before ordering more PIR, note when the mark appears and what lies immediately above it. Gather interior photographs, the duct route and available roof drawings. That way the roofer and ventilation installer can investigate the same point instead of two different positions on opposite sides of the roof. What needs repairing depends on the cause.

PIR board with a thin aluminium facing and a smaller sample with a visible cream-coloured core

Locate the ceiling mark on the plan

Measure from two fixed references such as external walls. Do not assume the mark is directly beneath a leak; water may travel along a component before reaching the ceiling.

Record weather and ventilation use

At each observation, note the date, rain, strong winds and outdoor temperature. Add whether the duct was in use and whether indoor humidity was unusually high.

A stain that returns after wind-driven rain from one direction suggests checking the flashing. A stain on dry, cold days also warrants checking insulation and condensation. Neither pattern establishes a diagnosis.

Trace water and air paths separately

The roofer checks how rainwater passes around the penetration and drains away. The installer checks the duct and its connections. Watertight flashing does not establish that the duct itself is airtight.

Identify the building's air control layer on the section. Ask how it was connected to the penetration. Filling the surrounding space with pieces of PIR does not prove that this junction is airtight.

What can a thermal image show?

A thermogram shows surface temperatures at the time of measurement. It does not directly show a torn membrane or the width of a gap between boards. Record the measurement conditions and the side of the assembly shown.

Pair the thermogram with a normal photograph from the same position. This lets the inspector relate a cooler outline to a corner, fixing or duct and decide where a closer check is warranted.

If the roof needs opening

Before the contractor opens the roof, agree how the exposed area will be protected against rain again. Let inspection findings determine the opening size rather than the dimensions of the visible stain.

Where the penetration is exposed, document the board layout, condition of the facings and continuity of the sealing layers. If the material is wet, adding a dry board will not remove the moisture source.

Checking after repair

The repair record should identify the cause and the connection corrected, such as the external flashing or the internal air seal around the duct. “Insulation improved” does not say what was done.

After repair, inspect again under conditions similar to those in which the stain grew. Distinguish the old mark drying out from fresh moisture appearing. Refer back to the dated photographs and readings if in doubt.

7 branches. Materials closer to your project.

Izoprofil.net map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E
  • BŁONIE — ul. Sochaczewska 138A
  • RADOM — ul. Grobickiego 8
  • ŁÓDŹ — Natolin 8
  • OLSZTYN — Barczewo, ul. Prosta 9
  • WROCŁAW — ul. Jerzmanowska 10C
  • GORZÓW WLKP. — ul. Zielona 33/34

Check prices and availability: +48 500 409 109

Free quote

Materials for your project