In brief

The price of tile-effect metal roofing per square metre helps to compare the material, but does not describe the cost of the finished covering. Full modules, cut-offs, flashings and the method of delivery are important. For a renovation, dismantling the old roof is added. To choose an offer, the same scope must be compared. It is worth doing this before setting the date for the team’s work. Check whether the seller calculates the total area or the coverage after overlaps. For a panel with overall dimensions of 1190 × 736 mm, the area is approximately 0.876 m². If its coverage is 1150 × 700 mm, one element covers 0.805 m². These are parameters of an example variant, not of all tile-effect metal roofing.

Metal roof tiles by a roof window during a roof inspection

Do both prices refer to the same area?

The same price per metre gives a different result depending on the basis of settlement. So ask for the price of the whole schedule and the number of panels. Finally, check whether the amounts are net or gross. Comparing one price with tax and another without tax can completely reverse the apparent order of the quotes.

How to calculate the number of modules?

For a simple area of 90 m², dividing by the coverage of 0.805 m² gives approximately 111.8. The mathematical minimum is therefore 112 panels. This is not yet an order for a real roof. You need to check the row layout, the hips, the eaves and the possibility of using offcuts on other roof slopes.

The layout calls for 120 panels with a nominal coverage of 96.6 m². At an illustrative €14.35/m² of cover excluding VAT, the panels cost €1386.21 excluding VAT. This example excludes flashings, fasteners, delivery and labour.

Which material features affect the price?

What matters is the steel thickness, the type of metallic protection and the organic coating. Profiling, format and colour are added. Variants may differ in warranty conditions and resistance to a specific environment. The term “matte” alone does not allow two coatings to be considered equivalent.

Ask for a full description of the sheets being compared. A cheaper quote may relate to a different thickness or a different type of finish. It does not have to be bad, but the difference must be assessed consciously. For an extension, also check the conformity of gloss and texture with the existing roof. The RAL number does not describe all visual features.

Check whether the stated thickness refers to the steel core and how it has been described in the documents. Do not compare the height of the profiling alone, because that is a different dimension. A deep profile may look massive even though it is made from the same sheet as a lower variant.

What should be added to the materials list?

Price the eaves strips, bargeboards, ridge, roof valleys and penetration flashings separately. Add fixings, sealants and the components required for roof ventilation. If the design includes snow guards or access to the chimney, these items must also appear in the order.

For a renovation, the components beneath the covering are added. The scope of replacing battens, counter-battens and the underlay should be based on an inspection. It is not worth omitting these items just to make the quote look cheaper. Material missing and ordered during the works can mean additional transport and downtime for the whole crew.

In the labour quote, separate the laying of the covering from the work on chimneys and windows. These details take time that the roof area does not describe. Two roofs with the same number of square metres can require completely different amounts of work. Scaffolding and protection of the occupied interior are also agreed separately.

Tile effect metal roofing – see the SteelProfil offer

How does phasing change the bill?

Two deliveries can make storage easier but increase the transport cost. Buying all the material at once requires space and protection. It is worth establishing whether a single batch can be reserved. This helps limit the risk of colour differences when ordering more later.

In the example renovation of a house in Gostyń, the roof over the residential part can be completed earlier than over the attached garage. A joint material list will make it easier to order a consistent coating. However, this does not mean that all sheets have to be delivered to the site on one day. Delivery and reservation conditions require separate agreement.

How do you read a finished quote?

Check the number of items, their lengths and the scope of extras. Also establish the unloading price and responsibility for equipment. With long sheets, lifting material onto the roof may require different organisation than with small panels. The ‘transport’ item alone does not say whether it includes unloading.

Finally, compare the total amount and the list of exclusions. Note the validity period of the quote and the rules for settling changes after measurement. The contractor should know whether the material was ordered according to the design or to a measurement of the finished roof structure. This difference matters if, during the renovation, the roof geometry turns out to be different from the old drawing.

Short answers from the site

Does the lowest price per m² mean the cheapest roof?

No. The result is changed by full sheets, waste, extras and labour. Compare the cost of the list for the same roof area and the same scope of work.

Is it worth buying a few extra panels?

This can make later repairs easier, but the extra stock should be agreed with the installer. It must also be given a dry, safe storage place.

7 branches. Materials closer to your project.

Izoprofil.net map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E
  • BŁONIE — ul. Sochaczewska 138A
  • RADOM — ul. Grobickiego 8
  • ŁÓDŹ — Natolin 8
  • OLSZTYN — Barczewo, ul. Prosta 9
  • WROCŁAW — ul. Jerzmanowska 10C
  • GORZÓW WLKP. — ul. Zielona 33/34

Check prices and availability: +48 500 409 109

Free quote

Materials for your project